Construction Scheduling: Principles and Practices (2nd Edition)

Amazon.com Price: $159.99 (as of 05/12/2019 16:21 PST- Details)

Description

This newsletter is a comprehensive, stand on my own reference for project management scheduling. It includes a unique combination of principles/fundamentals of scheduling and project management along side practical applications and tutorials of the 4 such a lot not unusual scheduling software programs–Microsoft Project, Primavera Project Planner (P3), SureTrak, P6 Project Manager and Contractor. Having scheduling information and software instructions in one book obviates the desire for 2 texts, and the exercises and examples within the scheduling portion are tied to the similar exercises within the software portions.

Home » Shop » Books » Subjects » Engineering and Transportation » Engineering » Industrial, Manufacturing and Operational Systems » Project Management » Technical » Construction Scheduling: Principles and Practices (2nd Edition)

Recent Products